Foreign Projects
- Howard air Force Base, Panama City, Panama C.A.
Geotechnical and Environmental Drilling. - Anasco Dam Site, Puerto Rico, U.S. Soil and Conservation Anasco, P.R.
Soil Test Borings, NX Coring, Packer Testing. - Nassau & Family island docking Facilities & Improvements Bureau of Public Works, Nassau, Bahamas,
Soil Test Borings, NX Coring, Shelby Tubes with Barge on New Providence, Andros, Eleuthra, and Exuma - Autec Radar Surveillance Towers, Andros, Bahamas
Southern Division, U.S. Naval Facilities, Charleston, S.C.
Soil Test Borings and NX Coring On and Offshore. - Guantanamo Bay, Cuba
Southern Division , U.S. Navy, Charleston, S.C.
Soil Test Borings and NX Coring On and Offshore. - Anderson Air Force Base, Tamuning, Guam
Soil Test Borings and 94mm Wireline Coring. - Nassau to Paradise Island Bridge, Nassau Bahamas
Soil Test Borings and Coring, Barge Drilling. - Ocean Cay, Bahamas
Coring for Mine Expansion, Barge Drilling. - Water and Power Authority, St. Thomas & St. Croix, U.S.V.I.
“4 Coring and Monitoring Well Installation. - Marriot Corporation, St. Thomas, U.S.V.I.
Geotechnical, HW Rock Coring. - Frenchman’s Reef Hotel, St. Thomas, U.S.V.I.
Geotechnical, HW Rock Coring. - Ocean Cay, Bahamas
Geotechnical, investigation for proposed power plant
C.P. Coring, SPT’s, Monitor Wells. - Jamalco Area 45, Jamaica
Geotechnical Investigation, HW Coring.
Domestic Projects
- Epcot, Walt Disney World, Orlando, Florida
Soil Test Borings in Swamps and On Land to 250 Feet. - Various Earthen Dam Sites, State of Mississippi, U.S.A.
Soil and ConservationService, Soil Test Borings and 4″ Coring Soil Auger Borings. - Studio Tours, Walt Disney World, Orlando, Florida
Soil Test Borings, Shelby Tubes, NX Coring. - U.S. Army Corps, Proposed Dike SR 60, Vero Beach, Florida
Soil Test Borings with Amphibious Swamp Equiment and Barge. - Florida Dept. of Enviromental Regulation, Lake Hancock, Polk County, Florida
Soil Test Borings with a Barge Determine Amount of Lake Bottom Sludge. - Savannah Electric Company, SECO Powerline Crossing, Savannah, Georgia
Soil Test Borings with Amphibious Swamp Equipment and Barge - Lake Jessup Bridge, Seminole county Expressway, Sanford, Florida
Soil Test Borings to 150′ using Weighted Drill muds to counteract 22 feet of artesian pressure. - Powerline Easement, Florida Power & Light, South Florida, Homestead, Florida to Port St. Lucie, Florida
Soil Test Borings, Shelby Tubes, NX Coring with Track Rigs and Amphibious Drill Rigs. - Florida Power & Light, Cocoa Beach, Florida
138KV Line from Cocoa to Cocoa Beach Via SR 520
Soil Test Borings, Barge Drilling. - Florida Power & Light, Cocoa Beach, Florida
138KV Transmission Line from Cocoa to Eau Gallie
Soil Test Borings with Barge Mounted Rig. - Florida Dept. of Tansportation, Tallahassee, Florida
Choctawahatchee River propose Bridge, Barge Drilling. - Florida Dept of Transportation, Tallahassee, Florida
I-95 Widening, Miami, Florida. - U.S. Department of the interior, Geological Survey Water Resources, Altamonte Springs, Florida
Reedy creek Improvement District, Orlando, Florida. - Department of Tansportation, Tallahassee, Florida Interstate 75.
- U.S. Geology Survey, Krome Avenue, Miami Florida
5″ Monitor Wells & 4″ Coring, Amphibious Rig. - Tri-Rail New River Bridge, Ft. Lauderdale, Florida 3.4″ Wireline Coring, Soil Test Borings with Truck Rig and Track Rig.
- Port of Tampa Bay, Tampa, Florida Soil Test Borings, 4″ Conventional Coring with Lift Boat.
- Cooper River Bridge, Mt. Pleasant, South Carolina 280′-3.4″ CP Wireline Coring though 10′ Diameter Drill Shaft Piles.
Ardaman & Associates – Orlando, FL
2005 – Spud Barge Mount Drill Rig – Bridge Borings 2.5 Centers to 150′ – For (F.D.O.T.) Escambia Bay Bridge, Pensacola, FL
2009 – Barge Drilling – LaRose, LA – SPT, 5″ Shelby Tubes – For (ACOE) – Louisiana
2009 – Barge Drilling – Golden Meadow, LA – SPT, 5″ Shelby Tubes – For (ACOE) – Louisiana
2009 – Amphibious Drilling – Savannah River – 60′ CPT Borings – For (ACOE) – Georgia
2009 – 2010 – Amphibious Mount Drill Rig Drilling – Houma, LA – SPT, 5″ Shelby Tubes – For (ACOE) – Louisiana
2011 – Swamp Monster – Plaquemines, LA – 5″ Shelby Tubes – For (ACOE) – Louisiana
2011 – Barge Drilling – Ft. Pike Historic Park – Slidell, LA – SPT, 5′ Shelby Tubes – For (ACOE) – Louisiana
CDM – Cammp, Dresser, Mckee Inc.
2009 – Barge Drilling – Baptiste Collette Navigational Channel – 3″ and 5″ Shelby Tubes & SPT Soil Sampling to 100′ – Plaquemines Parish-Louisiana – For (ACOE) – Louisiana
Challenge Engineering
2003 – Amdrill’s Jackup Barge Drilling ( Alton Rush) – 4″ Rock Coring & SPT Soil Sampling – Boring Depths 65′
Mean Low Tide for (ACOE) – Tampa Bay, FL
2004 – Amdrill’s Jackup Barge Drilling (Alton Rush) – Shipping Channels Deepening – 4″ Wireline Rock Coring & SPT
Soil Sampling – (ACOE) – Tampa Bay Harbor, FL
2008 – Barge Drilling – CCT A&B Tampa Bay – Tampa, FL – SPT & 4″ Coring
2009-2010 – Barge Drilling – 4″ Wireline Coring & SPT Soil Sampling – Phase 1 & 11-Harbor Deepening Borings &
Testing – St.Johns River – For ( ACOE) – Jacksonville, FL
2010 – Barge Drilling – Miami Harbor Deepening – Miami, FL – Continuous SPT & 4′ Wireline Coring – For
(ACOE) – Miami, FL
Great Lakes Dredge & Dock
2004 – Amdrill’s Jackup Barge Drilling (Alton Rush)-4″ Wireline Rock Coring & SPT Soil Sampling 65′
Mean Low Tide – For (ACOE) Miami Harbor Project – Miami, FL
GEOSOL Inc.
2011 – Barge Drilling – Long Key Channel – SPT Soil Sampling & 4′ Wireline Coring for (ACOE) – Long Key, FL
MACTEC
2006 – Spud Barge Drilling & Truck Mount Drill Rigs – Bridge Borings at Jewish Creek – 4″ Rock Coring & SPT Soil Sampling – For (F.D.O.T.) – Key Largo, FL
2010 – Barge Drilling – I-595 Project -4′ Wireline Coring & SPT Soil Sampling to 150′ – For (F.D.O.T.) – Ft. Lauderdale, FL
Nodarse & Associates Inc.
2010 – Barge Drilling – Sister Creek – SPT Soil Sampling to 200′ _ For (FDOT) – Jacksonville, FL
Southern Earth Sciences
2009 – Amphibious Drilling- Marsh Drilling to 120′ – 5′ Hydraulic Piston Sampling & 5″ Shelby Tubes for (ACOE) in Oakville, LA
2010 – Barge Drilling – (ACOE) – Kissimmee River S-65E, Okeechobee, FL-Continuous SPT
URS Corporation
2006 – Barge Drilling – Gulf Stream SPT Soil Sampling & 2.4″ Rock Coring – Tampa Bay
WPC
2007 – Amphibious Mount Drill Rig & Airboat to transport Personnel – SPT Soil Sampling & 4″ Wireline Rock Coring to 120′ -For
(ACOE) – Everglades Tamiami Trail- Miami, FL
GFA, INC
02/22/01 – Barge Mount Drill Rig – WCA – 3B Tree Island 3AN1-PT Sampling & Monitoring Well Construction in the water and on the head of Tree Island.
10/29/99-11/22/99 – Amphibious & Truck Mount Drill Rig – WCA-2A-ENRMercury Flux Project
SPT Drilling and Monitoring Well construction on the water and land.
05/1997 – Amphibious Mount Drill Rig – West Palm Beach – SPT Drilling




