Projects
Amdrill, Inc. has experience both foreign and domestic, here is a listing of just some projects that we have worked on.
Amdrill, Inc. has experience both foreign and domestic, here is a listing of just some projects that we have worked on.
2005 – Spud Barge Mount Drill Rig – Bridge Borings 2.5 Centers to 150′ – For (F.D.O.T.) Escambia Bay Bridge, Pensacola, FL
2009 – Barge Drilling – LaRose, LA – SPT, 5″ Shelby Tubes – For (ACOE) – Louisiana
2009 – Barge Drilling – Golden Meadow, LA – SPT, 5″ Shelby Tubes – For (ACOE) – Louisiana
2009 – Amphibious Drilling – Savannah River – 60′ CPT Borings – For (ACOE) – Georgia
2009 – 2010 – Amphibious Mount Drill Rig Drilling – Houma, LA – SPT, 5″ Shelby Tubes – For (ACOE) – Louisiana
2011 – Swamp Monster – Plaquemines, LA – 5″ Shelby Tubes – For (ACOE) – Louisiana
2011 – Barge Drilling – Ft. Pike Historic Park – Slidell, LA – SPT, 5′ Shelby Tubes – For (ACOE) – Louisiana
2009 – Barge Drilling – Baptiste Collette Navigational Channel – 3″ and 5″ Shelby Tubes & SPT Soil Sampling to 100′ – Plaquemines Parish-Louisiana – For (ACOE) – Louisiana
2011 – Barge & ATV Drilling – Kings Bay Naval Base – SPT Soil Sampling to 100′ – Kings Bay GA
2003 – Amdrill’s Jackup Barge Drilling ( Alton Rush) – 4″ Rock Coring & SPT Soil Sampling – Boring Depths 65′
Mean Low Tide for (ACOE) – Tampa Bay, FL
2004 – Amdrill’s Jackup Barge Drilling (Alton Rush) – Shipping Channels Deepening – 4″ Wireline Rock Coring & SPT
Soil Sampling – (ACOE) – Tampa Bay Harbor, FL
2008 – Barge Drilling – CCT A&B Tampa Bay – Tampa, FL – SPT & 4″ Coring
2009-2010 – Barge Drilling – 4″ Wireline Coring & SPT Soil Sampling – Phase 1 & 11-Harbor Deepening Borings &
Testing – St.Johns River – For ( ACOE) – Jacksonville, FL
2010 – Barge Drilling – Miami Harbor Deepening – Miami, FL – Continuous SPT & 4′ Wireline Coring – For
(ACOE) – Miami, FL
2004 – Amdrill’s Jackup Barge Drilling (Alton Rush)-4″ Wireline Rock Coring & SPT Soil Sampling 65′
Mean Low Tide – For (ACOE) Miami Harbor Project – Miami, FL
2011 – Barge Drilling – Long Key Channel – SPT Soil Sampling & 4′ Wireline Coring for (ACOE) – Long Key, FL
2006 – Spud Barge Drilling & Truck Mount Drill Rigs – Bridge Borings at Jewish Creek – 4″ Rock Coring & SPT Soil Sampling – For (F.D.O.T.) – Key Largo, FL
2010 – Barge Drilling – I-595 Project -4′ Wireline Coring & SPT Soil Sampling to 150′ – For (F.D.O.T.) – Ft. Lauderdale, FL
2010 – Barge Drilling – Sister Creek – SPT Soil Sampling to 200′ _ For (FDOT) – Jacksonville, FL
2009 – Amphibious Drilling- Marsh Drilling to 120′ – 5′ Hydraulic Piston Sampling & 5″ Shelby Tubes for (ACOE) in Oakville, LA
2010 – Barge Drilling – (ACOE) – Kissimmee River S-65E, Okeechobee, FL-Continuous SPT
2006 – Barge Drilling – Gulf Stream SPT Soil Sampling & 2.4″ Rock Coring – Tampa Bay
2007 – Amphibious Mount Drill Rig & Airboat to transport Personnel – SPT Soil Sampling & 4″ Wireline Rock Coring to 120′ -For
(ACOE) – Everglades Tamiami Trail- Miami, FL
02/22/01 – Barge Mount Drill Rig – WCA – 3B Tree Island 3AN1-PT Sampling & Monitoring Well Construction in the water and on the head of Tree Island.
10/29/99-11/22/99 – Amphibious & Truck Mount Drill Rig – WCA-2A-ENRMercury Flux Project
SPT Drilling and Monitoring Well construction on the water and land.
05/1997 – Amphibious Mount Drill Rig – West Palm Beach – SPT Drilling